HF Tower Rotor Replacement
Photos by Jay N2ELG
Team of Art, Barry, George, Jan, Jay, Mark, Matthew, Ralph (missing 1 person TBA)
Some teeth on the rotor were missing and broken. A refurbished rotor was ordered. The team constructed a GIN pole for the project. The team began at 9am Saturday, took a few breaks and finished about 3pm. The tower raising cable needs to be replaced which is for another date. |
||||
Watch Videos |
||||